Anchor’s New Colocation Fit Out – Stage One

Published February 6th, 2009 by Lachlan Cooper

Anchor’s colocation requirements have been growing steadily over the past few years, so we’ve recently taken the plunge to significantly increase our total datacentre floor space which will allow for many new racks. At this point we’re in the early stages of fitting out the suite, so we thought it an ideal chance to give our readers some insight into the process of fitting out a data centre.

A long view of the new Anchor suite area

A long view of the new Anchor suite area

The plan is to produce a new blog post for each step; and, of course, take plenty of pretty pictures along the way!

A handful of our new racks, some still in their wrapping

A handful of our new racks, some still in their wrapping

You can see above a few of the shiny new extra-wide racks that have already been delivered. The keen-eyed might also be able to see the tape marking the locations of the first few racks to be powered up shortly, with the under-floor power installation happening right now. The suite’s cage will be going in real soon now.

A long view from the opposite end of our new suite area

A long view from the opposite end of our new suite area

Redundant air-conditioning units

Redundant air-conditioning units

We’ll keep the blog updated as things progress, so check back soon for the next post!